Czech Republic / 2014 - 2015
The supply and installation of two vertical storage tanks (capacity of each 50 m3), pipeline, valves, pump and steel structure.
The construction of three different types of aboveground storage tanks (capacity 1500 m3, 200 m3 and 140 m3) and manufacturing and supply tank 0.4 m3. All tanks completely made of stainless steel. Including complete insulation and sheathing.
Design, delivery and recovery of electrical and automation control of technology at heating plant PGE Kielce.
(This project was implemented by subsidiary AUTEL, a.s.)
Construction of a new warehouse ammonia. New building storage with three cylindrical tanks with a capacity of 95 m3 each, slop tank for unloading rail cisterns, bottom unloading arm, new pipelines, the new control room, ammonia leak detection, sprinkler system, new MaR and control system.
The construction of new reservoir for light fuel oil (capacity 1300m3), including unloading system, pipelines and new system of measurement and control.
设计完成监测煤储量的控制系统。
设计安装完成胺的终端供应技术。
分三个步骤,重建了热电厂的单个锅炉的控制和配发系统,包括监测和评估厂内的能源配给。
完成装配、测量、调节及电压控制和炼焦厂的备用电池装配。
灰分管道的控制系统
设计安装完成发电厂的监测发热、电力消耗自控系统。